  1. The crawler shot blasting machine should clean the machine after each shift after work.

  2. The wear of the guard plate and the directional sleeve of the blasting machine and the splitting wheel should be checked frequently. If any wear parts with severe wear are found, they should be replaced immediately.

  3. Before the machine is running, all parts that need to be moved should be lubricated. The bearings on the main shaft of the shot blasting machine need to add 2# calcium-based grease once a week. The screw conveyor and the bearings on the hoist are added with 2# calcium-based grease once a month. The remaining bearings are added with 2# calcium-based grease once every 3-6 months. The mechanically oil is added once a week to the relatively active parts such as the chain, and the motor is lubricated according to the lubrication requirements.

  4. Regularly inspect each transmission component to remove dust and dirt from the parts and replace worn parts.

  5. When the shot blasting machine is inspecting and repairing, all power sources should be cut off to avoid accidents.

  6. The machine should check the fan for 48 hours, and remove the dust attached to the wheel to ensure smooth operation and long service life.

  7. The guard plate of the cleaning room can be replaced periodically according to the situation. When replacing the guard plate, the installation clearance between the guard plates should be controlled within 1.5mm. Refer to the schematic diagram when replacing.

  8. Replace the track, open the door, remove all the interference parts, and use the 4 hooks made of 10# steel bar to suspend the drive shaft and the track through the process hole in the upper part of the chamber. The track is pressed obliquely from the door.